← Comparison Sections
comparison-duo
stable BibliothèqueComparison Sections
Deux cartes cote a cote (Sans / Avec) pour mettre en evidence le contraste avant/apres ou nous-vs-eux, avec items a puces et glyphes differencies.
Aperçu
Code
Données de la section (à placer dans sections[])
{
"type": "comparison-duo",
"kicker_fr": "Avant / Apres",
"kicker_en": "Before / After",
"h2_fr": "Ce que change Waimia <i>concrètement</i>",
"h2_en": "What Waimia changes <i>in practice</i>",
"without_label_fr": "Sans Waimia",
"without_label_en": "Without Waimia",
"without_title_fr": "Outils disperses, equipe epuisee",
"without_title_en": "Scattered tools, exhausted team",
"without_items": [
{
"text_fr": "Chaque workflow est reinvente de zero a chaque projet",
"text_en": "Every workflow is reinvented from scratch on each project"
},
{
"text_fr": "Les decisions prennent 3x plus de temps par manque de visibilite",
"text_en": "Decisions take 3x longer due to lack of visibility"
},
{
"text_fr": "Les competences IA restent dans 2 profils, jamais transferees",
"text_en": "AI skills stay with 2 people, never transferred"
},
{
"text_fr": "Chaque outil genere sa propre dette de maintenance",
"text_en": "Each tool generates its own maintenance debt"
}
],
"with_label_fr": "Avec Waimia",
"with_label_en": "With Waimia",
"with_title_fr": "Un systeme qui produit, pas juste un projet",
"with_title_en": "A system that produces, not just a project",
"with_items": [
{
"text_fr": "Workflows documentes, reproductibles et transmissibles a toute l equipe",
"text_en": "Documented, repeatable workflows transferable to the whole team"
},
{
"text_fr": "Visibilite en temps reel sur l avancement et les resultats mesures",
"text_en": "Real-time visibility on progress and measured outcomes"
},
{
"text_fr": "Montee en competence collective, pas seulement individuelle",
"text_en": "Collective upskilling, not just individual"
},
{
"text_fr": "Architecture pensee pour scaler sans ajouter de charge operationnelle",
"text_en": "Architecture designed to scale without adding operational load"
}
]
}